Offshore diving vessel of project SDS08 “Stolny grad Yaroslavl. Uglich, offshore diving vessel of project SDS08, diving support vessel “Skandi Arctic”

A vessel of special construction or specially equipped, equipped with a diving complex and intended to support diving operations. EdwART. Explanatory Naval Dictionary, 2010 ... Marine Dictionary

DIVING VESSEL- service support. deep diving support vessel up to 100 m. V. s. divided into river, roadstead and sea. For lowering divers to depths. up to 20 m E.S. are equipped with diving ladders, diving pavilions at great depths and... ... Big Encyclopedic Polytechnic Dictionary

DIVING VESSEL- a service auxiliary vessel that provides diving operations at depths of up to 100 m. Depending on the area of ​​navigation and autonomy, Diving Vessels are divided into river, roadstead and sea. Descent to a depth of up to 60 m, where divers can breathe... ... Marine encyclopedic reference book

Vessel- This term has other meanings, see Vessel (meanings). Ship ... Wikipedia

Boat (ship)- This term has other meanings, see Bot. Modern Egyptian ... Wikipedia

Auxiliary ships and vessels of the Russian and USSR Navy- This article or section needs to be revised. Please improve the article in accordance with the rules for writing articles. Ships and naval support vessels ... Wikipedia

Navy support ships and vessels

Ships and support vessels of the Russian and USSR Navy- Ships and support vessels for naval forces are auxiliary ships and vessels for servicing their home bases and ensuring the daily activities of Navy warships. Support vessels are not intended for direct participation in... ... Wikipedia

Black Sea Fleet of the Russian Navy- This term has other meanings, see Black Sea Fleet. Black Sea Fleet of the Russian Navy ... Wikipedia

Pochaev- City of Pochaev, Ukrainian. Pochaiv Coat of Arms ... Wikipedia

Books

  • , Sarychev Anatoly Yakovlevich. A new novel from the author of the bestseller "Combat swimmers. Stalin's reconnaissance divers." A new task for underwater saboteurs from the legendary RON - Special Purpose Companies under the Intelligence Department of the Headquarters... Buy for 375 rubles
  • Special purpose company. Stalin's underwater saboteurs, A.Ya. Sarychev. A new novel from the author of the bestseller "Combat swimmers. Stalin's reconnaissance divers." A new task for underwater saboteurs from the legendary RON - the Special Purpose Company under the Intelligence Department of the Headquarters...

The sea diving vessel "Uglich" is the third in a series of four vessels of the SDS08 project, which were built at the Yaroslavl Shipyard by order of the Federal Institution "Directorate of the State Customer for Maritime Transport Development Programs" of the Federal Agency for Maritime and River Transport of the Ministry of Transport of the Russian Federation for the Federal State Institution "Gosmorspasluzhba of Russia" " The lead vessel of this project is the Stolny Grad Yaroslavl, which was put into operation on October 25, 2010. The second is Rostov the Great, which was put into operation on May 30, 2011.

The technical and working design of SDS08 was developed by the Marine Engineering Bureau, RKD and technological documentation - PKB "Petrobalt".

The sea diving vessel of the SDS08 project is designed to: provide diving and underwater technical work for divers at depths of up to 100 meters with sea waves up to 3 points; participation in rescue, ship-lifting and hydraulic engineering works to the extent of the equipment installed on the ship; examination of the bottom of water areas, sunken objects, underwater parts of ship hulls and hydraulic structures; ensuring the operation of small-sized remote-controlled underwater vehicles in sea conditions up to 4 points; surveying the bottom of water areas, underwater parts of hulls and rudder devices of ships (vessels), underwater parts of hydraulic structures and performing underwater work with the help of divers; performing underwater welding at depths of up to 25 meters and cutting at depths of up to 100 meters; lifting from depths of up to 100 meters discovered objects weighing up to 2.0 tons; soil erosion and soil removal; pumping water from a damaged vessel; pontoon blowing; working with hydraulic tools; inspection and cleaning of the underwater hull of ships, floating and onshore objects.

Offshore diving vessel of project SDS08 with ice class Ice 2, with an inclined stem and transom aft end, with an extended forecastle superstructure, with a forward accommodation superstructure and an engine room in the stern, with a diesel power plant, twin-shaft with adjustable pitch propellers, with a bow thruster has the following characteristics: Overall length 38.35 meters, overall beam about 7.92 meters, draft 2.1 meters. Speed ​​at full speed is 11 knots, speed of the economical vessel is 8 knots. Power is supplied from two main engines with a power of 442 kW each. Autonomy 5 days.

RS class:


The diving equipment includes:

  • pressure chamber for 4 divers;
  • diving bell with SPU;
  • diving equipment with SUPERLITE helmet and ventilated DESCO helmet;
  • universal diving equipment of the “dry” type;
  • means of water heating for divers;
  • means of communication;
  • underwater lighting facilities;
  • underwater television;
  • underwater welding/cutting;
  • hydraulic tool;
  • drainage means;
  • means of soil erosion;
  • remote-controlled underwater vehicle;
  • diving ladder

The sea diving vessel "Uglich" of project SDS08 was laid down on March 16, 2010, construction number 203. Launched on May 24, 2011. Will work as part of the Novorossiysk Department of Emergency Rescue and Underwater Technical Works. Put into operation on August 7, 2011. Specialists from the Novorossiysk ASPTR took an active part in the sea trials and acceptance of the vessel.

Marine diving vessel "Uglich" IMO: 9587403, flag Russia, home port of Astrakhan, was put into operation on August 7, 2011, construction number 203.

Photos used from the site:

« Skandi Arctic"This is the latest diving support vessel, equipped with the latest technology. Diving support vessel " Skandi Arctic"built at the STX OSV shipyard in the Romanian city of Tulcea in 2009 by order of the Norwegian company DOF with one goal - to protect the lives of divers performing work at the bottom of the sea.

Diving support vessel " Skandi Arctic» has a complex of modern equipment systems aimed at carrying out dangerous and expensive work in the area of ​​oil and gas fields on the coastal shelves, annually bringing in millions of dollars in profit.

The team of divers who will be engaged in underwater work is delivered on board the vessel by helicopter. Upon arrival, an integral part of the group of divers is to undergo a medical examination to determine their suitability for diving. At the same time, the equipment of the decompression chamber is being checked on the ship, where the shift will spend the next three weeks in cramped conditions and complete isolation.

On a diving support vessel " Skandi Arctic“There are six such cameras at once. Each of them is a sealed cylinder with a diameter of 2.5 meters, which is filled with a mixture of high pressure to ensure the safety of people. The fact is that when carrying out underwater work at a depth of up to 130 meters, divers are forced to stay inside the chamber, since the human body cannot withstand the high pressure. In the decompression chamber, the pressure gradually increases and the body adapts to this environment within 5 days, allowing a person to breathe the mixture normally and not die.

Each decompression chamber is equipped according to the principle of a universal dormitory. For normal living conditions for divers, there are seats, a common toilet, and a shower. The cramped living space contains six beds, as well as space for entertaining and eating. But divers are forbidden to leave the chamber so as not to die from a sharp pressure drop. To do this, they are regularly monitored by several specialists using ten video cameras to ensure that there is no threat to the divers. Their computerized post resembles Mission Control. From here you can see literally every step of the people in the cell. Highly qualified operator-controllers do not lose their attention for a minute. Wherever divers are - in a decompression chamber or on the seabed - they always remain under close scrutiny. Cameras monitor them even when people go to the toilet, where water also descends under the control of operators. In a word, the team of controllers is fully responsible for the lives of divers.

The crew of the diving support vessel “Skandi Arctic” consists of 120 people, who are specialists in various fields and perform a common task - efficient and safe diving operations.

diving support vessel "Skandi Arctic"







ship's navigation bridge

ship interior

After a daily medical examination, divers are allowed to dive. Their next step is to move into a device called a diving bell, which will transport them from an isolated room on board to the seabed. The device is like an elevator. The diving bell is hermetically connected to the decompression chamber. There is a hole (shaft) in the vessel's hull through which the diving bell is lowered directly to the work site.

underwater work

A common job for divers is to replace rusty fasteners (bolts) in hard-to-reach areas of underwater oil or gas production structures. This operation in offshore companies is regular maintenance. But this work is not easy, since you have to work in conditions of limited access.

Once in the decompression chamber, divers find themselves in another world. Then the air injection process begins. Before starting to gradually increase the pressure in the decompression chamber, the tightness of the hatches and airlocks is checked. The air pressure gradually increases over three hours to prepare the body for the enormous pressure in the ocean depths.

The slow increase in pressure is not felt in any way, except for the voices of the divers - they become funny, like cartoon characters. The fact is that a mixture of oxygen and helium at a depth of hundreds will not be toxic in comparison with ordinary air, which is 80 percent nitrogen. So for three weeks the divers talk like Donald the duckling.

On one of the decks of the diving support vessel " Skandi Arctic» there are gas storage facilities where 40 thousand cubic meters are stored. m helium. This is enough to supply some circus with it for 100 years.

While divers are adapting to the vessel's high pressure " Skandi Arctic"arrives at a point located above the underwater object. Thrusters at the bow and stern make it possible to easily remain in specified coordinates, deviating no more than 2 meters at wave heights of up to 5 m. During the descent of the diving bell, the vessel must remain motionless to avoid tension on the life support hoses.

When the ship takes position and the divers have completed adaptation, the underwater operation begins. On the loading deck, the diving bell is mounted above the decompression chamber, reminiscent of docking in outer space. Three divers enter the diving bell, and the device is lowered to a place where 30 years ago it was only possible in dreams, but now the process takes 3 minutes. The bell takes divers to depths where darkness reigns. They then leave the device and get to work. Two divers go to the object, and the third remains inside, belaying them. To avoid destruction, the diving bell hovers at a height of 2-3 meters above the object. Then, with the help of a crane, a container is lowered to the bottom, which contains the tools and spare parts necessary for carrying out dangerous work. With the container, physical contact with instruments is minimized, significantly reducing the risk of damage to wetsuits and life support lines. The work is carried out manually. Naturally, divers are in constant contact with the main post. At the control station, all bolt replacements performed are noted in a table so that none of them are missed, for which an unmanned underwater vehicle is lowered to the bottom. The shift of one diver lasts 6 hours.

Life support for divers at the bottom is carried out using individual hoses. Three hoses are supplied on the holding cable at once - electric for illumination and operation of video cameras; water heated to 30 degrees Celsius flows through the water hose into the lining of the wetsuit; oxygen hose through which the life-giving mixture is supplied.

Numerous specialists on board the ship and modern life support systems make it possible to work in dangerous conditions, but no technology can replace the mutual assistance of people. Without special training and mutual assistance, the chances of surviving at the bottom are negligible. In cold, deep water, a simple task becomes an extremely complex operation.

Having finished their work, the divers return to the bell. Within three minutes they are brought back on board the ship." Skandi Arctic" At the exit from the shaft, the diving bell is connected to the decompression chamber. There, divers take a shower, have dinner and rest while waiting for the next shift.

Food is delivered in an interesting way and also without breaking the seal. The food is left in the window, which is closed on both sides. After the operator makes sure that the domestic window is hermetically sealed, the divers open it from the other side. Another important task in the decompression chamber is the disposal of digestive products without depressurization. The solution was a powerful descent system with several airlocks controlled from a central station.
After several days of maintenance work, the underwater operation is completed. Then all divers, for five days, without leaving the decompression chamber, undergo the decompression process, and the vessel " Skandi Arctic"at this time it can proceed to the port or to another facility. After leaving the chamber, the threat to the divers' lives still remains, so medical personnel monitor the divers throughout the day.

Divers perform one of the most dangerous jobs on the planet, so after diving they need rest, and the diving support vessel " Skandi Arctic“does not know rest and is heading on a new voyage to ensure the normal operation of facilities supplying Europe with oil and gas.

Technical data of the diving support vessel “Skandi Arctic”:
Displacement - 18640 tons;
Length - 156 m;
Width - 26 m;
Draft - 7.4 m;
Crew - 120 people;
The diving depth of divers is 150 m;
The vessel's autonomy allows for up to 70 dives;

The sea diving vessel "Stolny Grad Yaroslavl" is the lead in a series of four vessels of the SDS08 project, which were built at the Yaroslavl Shipyard by order of the Federal Agency for Sea and River Transport of the Ministry of Transport of the Russian Federation for the Federal State Institution "Gosmorspasluzhba of Russia".

The technical and working design of SDS08 was developed by the Marine Engineering Bureau, RKD and technological documentation - PKB "Petrobalt".

Offshore diving vessel of project SDS08 is designed for:

providing diving and underwater technical work for divers at depths of up to 100 meters with sea waves up to 3 points;

participation in rescue, ship-lifting and hydraulic engineering works to the extent of the equipment installed on the ship;

examination of the bottom of water areas, sunken objects, underwater parts of ship hulls and hydraulic structures;

ensuring the operation of small-sized remote-controlled underwater vehicles in sea conditions up to 4 points;

surveying the bottom of water areas, underwater parts of hulls and rudder devices of ships (vessels), underwater parts of hydraulic structures and performing underwater work with the help of divers;

performing underwater welding at depths of up to 25 meters and cutting at depths of up to 100 meters;

lifting from depths of up to 100 meters discovered objects weighing up to 2.0 tons;

soil erosion and soil removal; pumping water from a damaged vessel;

pontoon blowing;

working with hydraulic tools; inspection and cleaning of the underwater hull of ships, floating and onshore objects.

Offshore diving vessel of project SDS08 with ice class Ice 2, with an inclined stem and transom aft end, with an extended forecastle superstructure, with a forward accommodation superstructure and an engine room in the stern, with a diesel power plant, twin-shaft with adjustable pitch propellers, with a bow thruster has the following characteristics: Overall length 38.35 meters, length between perpendiculars 36.35 meters. The overall width is about 7.92 meters, the width along the vertical line is 7.70 meters. The draft along the water line is 2.35 meters. Speed ​​at full speed is 12 knots, economical speed is 8 knots. The power of the main engines is 2 x 442 kW. Autonomy 5 days.

RS class: KM Ice 2 R2 AUT3-C OMBO SDS>100.

The project is noticeably different from similar vessels in operation:

1. The vessel is equipped with diving equipment that allows performing diving and underwater technical work at depths of up to 100 meters and has no analogues on existing vessels at the disposal of the State Marine Rescue Service of the Russian Federation;

2. Due to the presence of two air-foam monitors, the vessel has the ability to extinguish fires on other vessels and floating objects;

3. The vessel is equipped with a towing winch, which provides the functions of a towing vehicle;

4. When placing booms and a skimmer on board, the vessel will be able to provide OSR functions;

5. The characteristics of the vessel and special equipment ensure the performance of underwater rescue operations in waves up to 3 points, while the vessel’s approach to the site of the rescue operation is possible at wave heights of up to 7 meters;

6. To ensure the required performance, the vessel is equipped with two high-speed main engines with a power of 442 kW each, operating on adjustable pitch propellers, and also - to hold the vessel above the work site - a bow thruster with a power of 120 kW is provided;

7. The presence on board of a vessel of a modern remote-controlled underwater vehicle allows for inspection of the bottom of water areas, underwater parts of hulls and steering screw devices of ships, as well as the underwater part of hydraulic structures at depths of up to 100 meters;

8. For work on lifting sunken ships, repairing the underwater part of ships, repairing hydraulic structures, as well as to ensure rescue operations, equipment is provided for underwater welding at depths of up to 25 meters and underwater cutting at depths of up to 100 meters, in addition, the vessel’s lifting equipment allows lift individual fragments of sunken objects weighing up to 2 tons from a depth of up to 100 meters;

9. When participating in refloating operations, it is possible to pump out water from the flooded compartments of an emergency vessel, as well as purging ship-lifting pontoons.

The diving equipment includes: Pressure chamber for 4 divers; diving bell with SPU; diving equipment with SUPERLITE helmet and ventilated DESCO helmet; universal diving equipment of the “dry” type; means of water heating for divers; means of communication; underwater lighting facilities; underwater television; underwater welding/cutting; hydraulic tool; drainage means; means of soil erosion; remote-controlled underwater vehicle; diving ladder

Thus, the unique combination of equipment installed on the vessel, as well as a powerful power plant, allow the vessel to solve almost any specialized tasks related to underwater technical work at depths of up to 100 meters. In addition, the vessel can extinguish fires on other vessels using two air-foam monitors with a capacity of 180 cubic meters per hour, perform the functions of a towing vessel (an anchor-mooring-towing winch with a force of 7 tons is installed in the stern), pump out water from the compartments of an emergency vessel, participate in oil spill response operations. This combination of functions is unique for a vessel that is only 38 meters long.

The sea diving vessel of project SDS08 “Stolny Grad Yaroslavl” (building number 201) was laid down on August 28, 2009. The celebrations were attended by Deputy Minister of Transport of the Russian Federation Viktor Olersky, Director of the Department of State Policy in the Sphere of Maritime and River Transport of the Ministry of Transport of the Russian Federation Alexey Klyavin, Deputy Head of Rosmorrechflot Igor Zakharov, General Director of VP FINSUDPROM CJSC Igor Shekhelev, Head of the Federal State Institution Gosmorspasluzhba of Russia » Andrey Khaustov, Deputy Head of the Federal State Institution “Directorate of the State Customer for Maritime Transport Development Programs” Andrey Gusev and other colleagues.

Launched on August 12, 2010. From September 10 to 12, in accordance with the decision of the Minister of Transport of the Russian Federation Igor Levitin and the Governor of the Yaroslavl Region Sergei Vakhrukov, she took part in festive events dedicated to the millennium of the founding of the city of Yaroslavl.

On October 25, 2010, after successful acceptance tests, it was put into operation. Will work as part of the North Caspian Department of Emergency Rescue and Underwater Technical Works.

In the period from October 19 to October 29, 2014 - for the transportation of the central technological platform from the port of Astrakhan to the installation site at the field named after. V. Filanovsky. The work was carried out within the framework of the execution of the Contract on diving support during the transportation and installation of objects at the field, concluded between the FBU Marine Rescue Service of Rosmorrechflot and the Italian company SAIPEM.

In November 2014, the new jack-up floating drilling rig "Mercury" of the Super 116E project from the port of Astrakhan to the Caspian Sea.

On November 13, 2015, in extinguishing a fire on the m/v Saifula Kadi, lying in the seaport of Astrakhan without fuel and crew on board. December 31 to provide assistance during the sinking of the tugboat "Reidovy 23", which occurred when leaving Zolotoy Zaton.

From February 25 to February 29, 2016, in the localization and elimination of an oil spill in the area of ​​the village. Ikryanoye and in the area of ​​the Shipyard named after. "A.P. Guzhvina." During the operation, about 4,300 kg of petroleum products were collected.

On October 25, 2017, in a comprehensive exercise on the topic: “Providing assistance to an emergency vessel and people in distress in the waters of the 3rd raid of the seaport of Astrakhan,” which was held in the waters of the seaport of Astrakhan.